Test Required
|
Yes No
|
|
Plant Type
(Coal, Oil, Gas, Hydro, Incineration, Etc.)
|
|
|
Location of Expansion Joint
|
|
|
Flow Direction
|
|
|
Size
|
Pipe Size (Inside
Dimensions/Diameter of connecting Pip Flange)
|
in.
|
|
Installed Length (Inside
Dimensions/Diameter of connecting Pip Flange)
|
in.
|
|
Face to Face Dimension
|
in.
|
|
Flowing Medium
|
Medium (Air, Flue Gas, Liquid,
Slurry, Solid, etc. Is medium Corrosive, Abrasive or Viscous)
|
|
|
Velocity( In feet per minute)
|
|
|
Elastomer (Carcass/Lining)
|
Carcass
|
Lining
|
|
Temp.
|
Flowing Medium (operating /maximum)
|
Operate F.
|
Maximum
|
|
Surrounding Atmosphere (Min/Max)
|
Minimum
|
Maximum
|
|
Time Duration at Maximum Temp.
|
|
|
Pressure
|
Operational (Acutal Pressure System
Works Under)
|
Pos. PSIG
|
Neg. H2
|
|
Design (Highest/Most severe pressure expected during operation)
|
Pos. PSIG
|
Neg. H2
|
|
Surge (increased pressure due to
pump starts, valve closings, etc.)
|
Pos. PSIG
|
Neg. H2
|
|
Test (Hydrostatic test used to
demonstrate system capability)
|
Pos. PSIG
|
Neg. H2
|
|
Type (Constan t, Intermittent, Shock, Pulsating, etc.)
|
|
|
Movements
|
Axial Compression (Result of pipe
Extention-Expansion)
|
in.
|
|
Actual Extension (Result of pipe
contraction)
|
in.
|
|
Lateral Deflection
|
in.
|
|
Angular
|
degrees
|
|
Torsion
|
degrees
|
|
Vibration
|
F
|
A
|
|
Misc.
|
Pipe Flange Drilling (Indicate
specific standard, if special, provide: Flange O.D., Bolt, Circle, Number and Size of Holes)
|
Specification
|
|
Mating Pipe Flange Thickness
|
in.
|
|
No. of Arches
|
|
|
Location of
|
|
|
Access
|
Retaining Rings (Are required on
all installations. Reusable, they do not need to be ordered with replacement or spare expansion joints)
|
Yes
No
|
|
Control Unit Assemblies (Are recommended for use in all expansion joint applications. Control units must be used when piping support or anchoring is insufficient)
|
Yes
No
|
|
Flow Liners or Filled Arches
|
Yes
No
|
|
Name:
Company:
Address:
State:
Zip:
Email Address:
Comments:
|
|
|
|